مشاريع الخدمات الصناعية لـ تيكوركس


# الاسم العميل معلومات الاشخاص السنة الحالة تفاصيل الملف
6 Upgrading of 115Kv Protection at SEC Jisha & Idwa Substations Power Flow Contracting Upgrading of 115Kv Protection at SEC Jisha & Idwa Substations 2015 Completed - Upgrading and Testing of SCADA System - Installation of 115Kv Protection Panels - Testing and Commissioning of 115Kv Surge Arrestor and accessories. فتح الملف
7 Installation of Two (2) MetalClad Switchgear 13.8kV 1250V in SEC SANG S/S Saudi Edrak Contracting Co. Ltd. Saudi Edrak Contracting Co. Ltd. 2015 Completed - Testing of O/C Relays (Mfr: ABB, Model: REF615) - Testing of Power Meter (Mfr: Integra, Model: 1530) - Testing of Trasducers, TRIAD2 - Mark-up Drawings of Two Metalclad Switchgear 13.8kV 1250A in SANG S/S فتح الملف
8 Upgrading of Busbar Protection and Transformer Protection at SEC Faras and Shedgum Power Plant Power Flow Contracting Power Flow Contracting 2016 Completed - Upgrading and Testing of SCADA System - Installation 380Kv Busbar Protection and 380/230Kv Transformer Protection panels. فتح الملف
9 Resolve the Frequent Electrical Interruptions at Station 25 in Al-Ahsa Saudi Irrigation Organization Saudi Irrigation Organization 2017 Completed - Re-engineering and design the station electrical scheme. - Re-habilitation of existing circuit breakers فتح الملف
10 Major PM of Four (4) Main 13.8 KV/230KV 133MVA Generators Transformers at Shedgum Power Plant KAFOU Technical Services KAFOU Technical Services 2018 Completed - Take oil samples and perform DGA and oil test as per ASTM standard. - Test and calibrate temperature indicators, Bucholz relays, sudden pressure relays, pressure relief device etc and replace if defective. - Inspect Conservator level gauges for Main tank and OLTC. Inspect On-Load and Off –Load tap changer parts, test tap changer by manual and electrical operation, and replace any defective parts. Test OLTC oil for healthiness. Replace oil if required. - Perform the electrical test of the transformer for Insulation resistance and PI of HV and LV winding, Excitation current test, Resistance measurement of HV and LV winding , Turns ratio test at all tap positions, Insulation power factor test for transformer windings and associated bushings. Grounding Transformer, Neutral grounding Resistors, Reactors. فتح الملف
11 Replacement of Three Transformers at Saudi Irrigation Organization in Al-Ahsa (Northern Area) Saudi Irrigation Organization Saudi Irrigation Organization 2018 Completed - Dismantling of existing three (3) transformers - Erection & installation of three (3) new transformers (1000KVA, 13.8/400-270) - Installation of three (3) Manual Transfer Switch - Laying and termination of 630MM2 cables - Testing & Commissioning. فتح الملف
12 Replacement of Three Transformers at Saudi Irrigation Organization in Al-Ahsa (Southern Area) Saudi Irrigation Organization Saudi Irrigation Organization 2018 Completed - Dismantling of existing three (3) transformers - Erection & installation of three (3) new transformers (1000KVA, 13.8/400-270) - Installation of three (3) Manual Transfer Switch - Laying and termination of 630MM2 cables - Testing & Commissioning. فتح الملف
13 Installation, Testing & Commissioning of Eight (4) Line Protection Panels for Mahasen - Hajer 115kV Line FAST LINX Trading & Industrial Supplies FAST LINX Trading & Industrial Supplies 2018 Completed - Complete Engineering & Design for new eight (4) Line protection panels. - Dismantling of existing eight (4) protection panels at four substations. - Erection & installation of eight (4) new protection panels and two (2) communication converter panels (wall-mounted) - Laying & termination of cables from new installed panels to CTs, SCADA RTU, SOE, Ann., DFR, and DC panels. - Testing & Commissioning (complete functional tests) of installed equipment فتح الملف
14 Testing of Four (4) Transformers (13/20 MVA, 33/13.SKV) in Central Area, Saudi Arabia "TAQQAT A member of Abdullah Fouad Group" TAQQAT A member of Abdullah Fouad Group 2018 Completed To perform onsite testing of 4 nos. 13/20 MVA, 33/13.SKV Transformers (2 in RIYADH PP4, 1 in ALKHARJ, and 1 in ALQASSIM), that include Sweep Frequency Response Analysis (Finger print test), Calibration of Transformer winding & oil temperature gauges, Excitation Current Test, and Record all the Test report of the Transformer. فتح الملف
15 Supplying, Instalation & Testing and commissioning of Four (4) Water Mixer at Zone 3. Saudi Irrigation Organization Saudi Irrigation Organization 2019 Completed Supplying, Instalation & Testing and commissioning of Four (4) IEC Water Mixer (20 HP) at Zone 3 Water Tank. فتح الملف
16 125MVA Power XFMR Oil evacuation, Filling & Filtration Activities at RAS QURRIYAH GCC Substation. Cegelec Saudi Co. Cegelec Saudi Co. 2019 Completed 125MVA Power XFMR Oil evacuation, Filling & Filtration Activities at RAS QURRIYAH GCC Substation. فتح الملف
17 Vacuuming Process of Unit Transformer at Qurriyah PP. JAL International JAL International 2019 Completed Preforming Vacuuming Process of Unit Transformer at Qurriyah PP. فتح الملف
18 Corrective maintenance (CM), perventive maintenance (PM) and system analyzing of MV and LV equipment for HIDA at Al Amariyah Station Saudi Irrigation Organization Saudi Irrigation Organization 2019 Completed Breaker & cutout swithes test procedure: - Perform General inspection. - Open / close operation response. - Contact resistance test. - Insulation resistance test. - Timing test for MV barker. Relay Test Procedures: - Visual check. - Isolation Check. - Check the existing relay setting and compare it with setting sheet and then change what ever required. - Pick up Test as per the setting. - Timing test. - Trip Test. Transformer Test Proucedures: - Oil filtration and oil changing. - Visual check. - Cleaning. - Winding insulation test. - Terminals check. فتح الملف
19 Supplying, Insalling & Testing and Commissioning of Two (2) GEFRAN Motor VFDs At Al Omran Sation. Saudi Irrigation Organization Saudi Irrigation Organization 2019 Completed Supplying, Insalling & Testing and Commissioning of Two (2) GEFRAN Motor VFDs (350KW-380V-60HZ) At Al Uyon Sation. فتح الملف
20 Supplying, Insalling & Testing and Commissioning of Three (3) GEFRAN Motor VFDs with inclosures At Al water Treatment Sation. Saudi Irrigation Organization Saudi Irrigation Organization 2019 Completed Supplying, Insalling & Testing and Commissioning of Three (3) GEFRAN Motor VFDs with inclosures (15KW-380V-60HZ) At Al water Treatment Sation (Main Office) فتح الملف
21 Perventive Maintenance (PM) of 480V of 32 circuit breakers. KAFOU Technical Services KAFOU Technical Services 2019 Completed Breaker & cutout swithes test procedure: - Perform General inspection. - Open / close operation response. - Contact resistance test. - Insulation resistance test. - Timing test for MV barker. فتح الملف
22 Dismantelling of Stainless-steel oil tank, supplying, istalling & connecting new oil tank in Al Hasa National Guard King Abdulaziz Hospital. Al Hasa National Guard King Abdulaziz Hospital. Al Hasa National Guard King Abdulaziz Hospital. 2019 Completed Oil Tank Dismantelling: - Removing The old oil tank. - Cleaning of cach base of the tank. Oil Tank Supplying, Installing And connecting: - Supplying a new Stainless-steel oil tank. - Intallatttion of new one. - Connecting new one by doing all pipping work. فتح الملف
23 Corrective maintenance (CM), perventive maintenance (PM) and system analyzing of MV and LV equipment for HIDA at Domat Al jandal for 18 wells & 5 main station. Saudi Irrigation Organization Saudi Irrigation Organization 2019 Completed Breaker & cutout swithes test procedure: - Perform General inspection. - Open / close operation response. - Contact resistance test. - Insulation resistance test. - Timing test for MV barker. Relay Test Procedures: - Visual check. - Isolation Check. - Check the existing relay setting and compare it with setting sheet and then change what ever required. - Pick up Test as per the setting. - Timing test. - Trip Test. Transformer Test Proucedures: - Visual check. - Cleaning. - Winding insulation test. - Terminals check. فتح الملف
24 Perventive Maintenance (PM) and system analyzing of MV and LV equipment for HIDA at Al Uyon Pump station, Omran Pump Station, Kilo1,3&4 and HIDA main office main supply station. Saudi Irrigation Organization Saudi Irrigation Organization 2019 Completed - PM of 3 circuit breakers 13.8kv/630Amp. - PM of 4 circuit breakers 4000Amp. - PM of one circuit breaker 875Amp. - PM and testing of 5 transformers 13.8kv/480v. - PM of 5 circuit breakers 1250Amp. - PM of 4 circuit breakers 800Amp. - PM of 10 circuit breakers 2000Amp. - PM of one circuit breaker 16000Amp. - PM of 2 circuit breakers 1000Amp. - Functional test of 5 ATS. - PM of 4 cirRing Main Unit (RMU). - PM of 2 Protection system. فتح الملف
25 MV/LV CBs 97 panels & RMUs Testing Scope at KSAU-HS-ER JASH TECHNICAL SERVICES CO.LTD JASH TECHNICAL SERVICES CO.LTD 2019 Completed Breaker test procedure: - Perform General inspection. - Open / close operation response. - Contact resistance test. - Insulation resistance test. - Timing test for MV barker. Relay Test Procedures: - Visual check. - Isolation Check. - Check the existing relay setting and compare it with setting sheet and then change what ever required. - Pick up Test as per the setting. - Timing test. - Trip Test. فتح الملف
26 Installation, Testing & Commissioning of Eight (4) Line Protection Panels Uthmaiyah PP – RWPS # 4 115kV Line FAST LINX Trading & Industrial Supplies FAST LINX Trading & Industrial Supplies 2019 Completed - Complete Engineering & Design for new eight (4) Line protection panels. - Dismantling of existing eight (4) protection panels at four substations. - Erection & installation of eight (4) new protection panels and two (2) communication converter panels (wall-mounted) - Laying & termination of cables from new installed panels to CTs, SCADA RTU, SOE, Ann., DFR, and DC panels. - Testing & Commissioning. فتح الملف
27 Corrective maintenance & system analyzing of LV equipment at Station#10 Saudi Irrigation Organization Saudi Irrigation Organization 2019 Completed - System analyzing of LV system. - Preparing new drawings of the exsisting scheme. - LV bus maintainance & electrical testing. - Redesigning the scheme. - Correcting the ATS scheme of incomers & bus-tie. - Correcting the ATS scheme of stand-by generator and LV system. فتح الملف
28 Corrective maintenance of LV equipment, trouble shooting for automatic transfer scheme for main source and reolace MV bus tie breaker at Station#6 Saudi Irrigation Organization Saudi Irrigation Organization 2019 Completed - Trouble shooting of closing and opening circuit for LV bus coupler “Q2” & incomer#1 “Q1”. - Supplying one LV BKR. - Replacing of LV bus coupler “Q2” with new one. - Testing and maintaining of LV bus coupler “Q2”, incomer#1 “Q1” & incomer#2 “Q3”. فتح الملف
29 Re-designing & upgrading of LV CBs Distrbution Panels, Installation Scope For Gasolin Station at HIDA Main Office Saudi Irrigation Organization Saudi Irrigation Organization 2019 Completed - Dismantling existing old Panels. - Shifting old panels to customer store. - Relocating & Instalation of new condotes & new panels. - New wires pulling. - Terminations. - Relocating of Automation system. فتح الملف
30 Repair work for the burned Air Circuit Breaker in MCC-2D at SEC Qurayyah Power Plant KAFOU Technical Services KAFOU Technical Services 2019 Completed - Remove the existing air circuit breaker (01) and replace with brand new air circuit breaker (with overcurrent relay) from SEC approved OEM’s. - All components in the Incomer ACB’s cubicle, Incomer ACB’s Protection cubical, Turning Oil Pump ACB’s Cubicle, and Air Extraction Vacuum Pump ACB’s cubical shall be replaced by brand new components. - Minor T&I shall be performed on all air circuit breakers except the new replaced air circuit breaker (total 5 breakers). - Minor T&I shall be performed on all MCCB. فتح الملف
31 Power XFMRs Corrective Maintenance (CM) Activities at SEC Faras Power Plant KAFOU Technical Services KAFOU Technical Services 2019 Completed - Pressure relief devices and OLTC main buchloz relay not operate the lock out relay for GSU # 16 - Mechanical devices not operate the lock out relay for GSU # 17 - Standing alarm in hydrant device for GSU # 17 فتح الملف
32 Supply, installation and commissioning of protection and control panel at Omran S/S Saudi Irrigation Organization Saudi Irrigation Organization 2020 Completed Supply, installation and commissioning of protection and control panel at Omran S/S including excavation, supply and lating of power and control cables, errection of cable trays and terminations as per approved standards. فتح الملف
33 MV XFMRs Maintenance at National Industrial Training Institute (NITI) Ezdan Ezdan 2020 Completed Carrying out major PM & oil filtration for MV transformer in National Industrial Training Institute (NITI). فتح الملف
34 Supply and Installation Solar Lighting System at HIDA Envoirmental Station Saudi Irrigation Organization Saudi Irrigation Organization 2020 Completed Supplying, Installing, Tsting & Commissioning and energizing Sloar Lights for Invoirmental Station. فتح الملف
35 Modification of station’s pumps control system & VFDs system at HIDA – Al Omran Station – Sector No. 9 Saudi Irrigation Organization Saudi Irrigation Organization 2020 Completed Modifying the control system of the pumps by Supplying, Installing, Tsting & Commissioning and energizing LCP, MCCP, Junction box, control cables, power cables, installing cable tray, making cable trunches & manhole. فتح الملف
36 MV Substation cables Testing at Alamer Mall North Abdullah Ali Alamer & Brother Trading Co. Abdullah Ali Alamer & Brother Trading Co. 2020 Completed Performing electrical Testing for MV cables for seven (7) MV XFMRs & seven (7) RMU فتح الملف
37 Rectifying HV chamber oil leakage problem for 40MVA Shunt reactor #2 in SEC – Dammam Housing 380/115/13.8KV BSP TAQQAT Global Co. TAQQAT Global Co. 2020 Completed - HV chamber oil draining retification of oil leakage near the pressure release device coupling plunge of shunt# 2 & hv chamber oil filling & oil quality after oil (DGA & oil quality after oil filteration before refilling hv chamber) of shunt reactor # 2 (S.#20154299TRC025-002) (MAKE: HHI, KOREA) (40MVAR) in Dammam Housing 380/115/13.8KV BSP. فتح الملف
38 Major Electrical System Modification at HIDA Main office water desalination plant Saudi Irrigation Organization Saudi Irrigation Organization 2020 Completed - Supplying, Installing, Tsting & Commissioning and energizing Three (3) 15KW VFDs with its control panels. - Supplying, Installing, Tsting & Commissioning and energizing SCADA System & PLC System and connecting them to control center. - Supplying, Installing, Tsting & Commissioning and energizing (MCC remote I/O and HMI) for water Pumps. - Supplying, Installing, Tsting & Commissioning and energizing (Infield remote I/O). - Supplying, Installing, Tsting & Commissioning and energizing water tanks (LEVEL TRANSMITTERs). - Supplying, Installing, Tsting & Commissioning and energizing the pumps control operation system by configuring the communication/control commands protocol. Activating differential & integral control system for the VFDs. - Supplying, Installing, Tsting & Commissioning and energizing Motorized Valves and connecting their control to the control system. فتح الملف
39 Corrective maintenance (CM) of MV and LV equipment for HIDA at Riyadh Main Station Saudi Irrigation Organization Saudi Irrigation Organization 2020 Completed Breaker: - Repairing Racking-In & Racking-Out problem of Main CB (SGA-101) for Transformer No. (TR101). - Repairing Opening & Closing problem of Ground switch for transformer (TR 102). - Repairing Opening & Closing problem of Disconnect switch for transformer (TR 101). - Insulation resistance test. - Timing test for MV barker. - Performing PM for (44) 380V CBs. - Performing PM for (7) main distribution Panels Relays. Battary & Battary Charger: - Performing PM for DC system including its protection. Pump: - Repairing Pump # (G-101) terminals. Transformer: - Performing electrical tests for 5MVA Aramco Transformer. - Repairing & rewinding Three(3) cooling fans for XFMR# (TR 101). - Repairing & rewinding cooling fans for XFMR# (TR 121 & TR 102). - Performing PM for Two(2) grounding transformers. - Performing PM for Three(3) 4.16KV Disconnect Isolators. Potintial Transformers: - Performing PM & Testing of PTs فتح الملف
40 125MVA Shunt Reactor Dismantilling Activities at RAS QURRIYAH GCC Substation. Cegelec Saudi Co. Cegelec Saudi Co. 2020 Completed - Oil draining of 125MVA Shunt Reactor. - Assesting in 125MVA Shunt Reactor Dismantilling. فتح الملف
41 Supplying, Installation LED screen 2.88m x 2.88m, pixcel pitch 6 outdoor with its steel structure for Led Secreen. Abdullah Saeed Al Ghamdi (ASGE) Group Abdullah Saeed Al Ghamdi (ASGE) Group 2020 Completed - Supplying, Instalation steel structure for Led Secreen. - Supplying, Instalation LED screen 2.88m x 2.88m, pixcel pitch 6 outdoor. فتح الملف
42 Supplying, Installation & Testing and commissioning of Power Factor System at Al Omran Station. Saudi Irrigation Organization Saudi Irrigation Organization 2020 Completed Supplying, Instalation & Testing and commissioning of Power Factor System at Al Omran Station. فتح الملف
43 Checking and re-filling of SF6 Gas for ABB type CTC-F RMU. Civil Works Co. Civil Works Co. 2020 Completed Checking and re-filling of SF6 Gas for ABB type CTC-F RMU. فتح الملف
44 توريد كيبل كهربائي CABLE CU/XLPE/PVC 1KV 1C*300 MM2) كيبل كهرباء Saudi Irrigation Organization Saudi Irrigation Organization 2021 Completed توريد كيبل كهربائي CABLE CU/XLPE/PVC 1KV 1C*300 MM2) كيبل كهرباء فتح الملف
45 صيانة اللوح المغذية لمخارج المزارعين (SCADA Panel) Saudi Irrigation Organization Saudi Irrigation Organization 2021 Completed صيانة اللوح المغذية لمخارج المزارعين (SCADA Panel) فتح الملف
46 الصيانة التصحيحية والوقائية للمنظومة الكهربائية بقطاع 6 وقطاع 9 Saudi Irrigation Organization Saudi Irrigation Organization 2021 Completed الصيانة التصحيحية والوقائية للمنظومة الكهربائية بقطاع 6 وقطاع 9 فتح الملف
47 صيانة تصحيحية ووقائية على المحولات والقواطع الكهربائية بفروع المؤسسة بالرياض والجارودية والأفلاج Saudi Irrigation Organization Saudi Irrigation Organization 2021 Completed صيانة تصحيحية ووقائية على المحولات والقواطع الكهربائية بفروع المؤسسة بالرياض والجارودية والأفلاج فتح الملف
48 توريد صمامات لزوم قطاعات فرع الأحساء Saudi Irrigation Organization Saudi Irrigation Organization 2021 Completed توريد صمامات لزوم قطاعات فرع الأحساء فتح الملف
49 ربط 3 مضخات إلى خزان التبريد بماسورة الإمداد الرئيسية بفرع المؤسسة العامة للري بمحافظة الأفلاج Saudi Irrigation Organization Saudi Irrigation Organization 2021 Completed ربط 3 مضخات إلى خزان التبريد بماسورة الإمداد الرئيسية بفرع المؤسسة العامة للري بمحافظة الأفلاج فتح الملف
50 توريد وتركيب واستبدال مرشحات الهواء الحديدية للخلاطات (ايطاليا) Saudi Irrigation Organization Saudi Irrigation Organization 2021 Completed توريد وتركيب واستبدال مرشحات الهواء الحديدية للخلاطات (ايطاليا) فتح الملف
51 تركيب وتشغيل منظومة كهربائية وميكانيكية لخزان التبريد لفرع المؤسسة العامة للري بمحافظة الأفلاج Saudi Irrigation Organization Saudi Irrigation Organization 2021 Completed تركيب وتشغيل منظومة كهربائية وميكانيكية لخزان التبريد لفرع المؤسسة العامة للري بمحافظة الأفلاج فتح الملف
52 نقل شاشات التحكم (HMI) في كيلو 7 من غرفة التحكم الحالية إلى غرفة أخرى Saudi Irrigation Organization Saudi Irrigation Organization 2021 Completed نقل شاشات التحكم (HMI) في كيلو 7 من غرفة التحكم الحالية إلى غرفة أخرى فتح الملف
53 صيانة المنظومة الكهربائية وفحص المحولات في المؤسسة العامة للري وفروعها Saudi Irrigation Organization Saudi Irrigation Organization 2021 Completed صيانة المنظومة الكهربائية وفحص المحولات في المؤسسة العامة للري وفروعها فتح الملف
54 توريد وتركيب وتشغيل مخارج صمامات مزارعين مطورة لمكتب الحارة Saudi Irrigation Organization Saudi Irrigation Organization 2021 Completed توريد وتركيب وتشغيل مخارج صمامات مزارعين مطورة لمكتب الحارة فتح الملف
55 إزالة مغير السرعة القديم مع كابلات الغذية الكربائية والتحكم وتوريد وتركيب واختبار متحكم السرعة للضخة (VFD) حسب المواصفات التالية: 75kw - 90kw (102-122 hp) 380/480V Gefran, Italy Saudi Irrigation Organization Saudi Irrigation Organization 2021 Completed إزالة مغير السرعة القديم مع كابلات الغذية الكربائية والتحكم وتوريد وتركيب واختبار متحكم السرعة للضخة (VFD) حسب المواصفات التالية: 75kw - 90kw (102-122 hp) 380/480V Gefran, Italy فتح الملف
56 توريد جهاز قارئ تدفق المياه مزودة بجهاز القراءة الأساسي وحساس قراءة التدفق Saudi Irrigation Organization Saudi Irrigation Organization 2021 Completed توريد جهاز قارئ تدفق المياه مزودة بجهاز القراءة الأساسي وحساس قراءة التدفق فتح الملف
57 توريد وتركيب لوحة تشغيل وتحكم وحماية كهربائية (مجهزة بطرفيات للتحكم عن بعد SCADA) مع ما يلزم من حفر خنادق وتوريد وتمديد كوابل تغذية وتحكم Saudi Irrigation Organization Saudi Irrigation Organization 2021 Completed توريد وتركيب لوحة تشغيل وتحكم وحماية كهربائية (مجهزة بطرفيات للتحكم عن بعد SCADA) مع ما يلزم من حفر خنادق وتوريد وتمديد كوابل تغذية وتحكم فتح الملف
58 تضمين مضخة بئر التغذية الرئيسي (28 حصان) في منظومة التحكم الآلي وبطها بأجهزة قياس مستوى الماء في الخزان الرئيسي مع ما يلزم من أجهزة ومعدات Saudi Irrigation Organization Saudi Irrigation Organization 2021 Completed تضمين مضخة بئر التغذية الرئيسي (28 حصان) في منظومة التحكم الآلي وبطها بأجهزة قياس مستوى الماء في الخزان الرئيسي مع ما يلزم من أجهزة ومعدات فتح الملف
59 Replacement of Old Breaker Mechanism with Installation of new Breaker in Meredian and other SEC stations in Dammam & Khobar Branch Al- ataa Al-shamel General Contracting Company Branch Al- ataa Al-shamel General Contracting Company 2021 Completed Replacement of Old Breaker Mechanism with Installation of new Breaker in Meredian and other SEC stations in Dammam & Khobar فتح الملف
60 Installation, Connection and Testing of Annuciator Panel at SEC Station, Jubail SS American Techno Controls Co. American Techno Controls Co. 2021 Completed Installation, Connection and Testing of Annuciator Panel at SEC Station, Jubail SS فتح الملف
61 Construction of 380KV D/C OHTLs for interconnection of Marjan 380KV BSP - Portion 1 LARSEN & TOUBRO SAUDI ARABIA LLC LARSEN & TOUBRO SAUDI ARABIA LLC 2021 Completed 1- Shifting of Conductor, OPGW, Insulators and associated hardware, Spacer Damper to site, Insulator Hanging and Pilot wire Paying out for conductor 6-Phase. 2- Conductor Pulling (quad bundle) 6 Phase 3- Conductor Sagging, Conductor clipping, jumper and spacer Installation. 4- Roller Hanging and Pilot wire Paying out for OPGW 2 Ckt. 5- OPGW Pulling (Twin bundle) 2 Ckt, Lead Down, Sagging, Clipping فتح الملف
62 SCC - calibration of energy meters Saudi Cement Saudi Cement 2021 Completed Calibration of energy meters QYT=115 فتح الملف
63 SCC - PM & Repair Battery Chagers Panel 17 Saudi Cement Saudi Cement 2021 Completed PM & Repair Battery Chagers & Battery Bank QYT=17 فتح الملف
64 Calibration of therty (30) energy meters in SEC Qurayyah PP KAFOU Technical Services KAFOU Technical Services 2021 Completed Calibration of therty (30) Nexus-1250 energy meters in SEC Qurayyah PP فتح الملف
65 Repair of oil leak for 6.9/2.08 kV 3250 KVA isolation transformer in JGP Tihama Power Generation Company Ltd. Tihama Power Generation Company Ltd. 2021 Completed 1- Isolate transformer and disconnect HV terminals. 2- Drain oil to appropriate level. 3- Open HV side bushings. 4- Repair of oil leak by replacement of Gasket. 5- Toping up transformer’s oil level. 6- Oil filtration. 7- Perform BDV oil test. 8- Take oil samples for DGA test before and after oil filtration. 9- Submit technical report. فتح الملف
66 PM for 132/13.8KV 90/110 MVA transformer in ARAR PP KAFOU Technical Services KAFOU Technical Services 2021 Completed PM for 132/13.8KV 90/110 MVA transformer in ARAR PP فتح الملف
67 Major PM & cold wash for T758 266MVA Transformer at SEC FARAS Power Plant KAFOU Technical Services KAFOU Technical Services 2021 Completed Major PM of One (01) 266 MVA 230KV / 13.8KV transformer at FARAS PP and Oil filtration. فتح الملف
68 Maintenance and Repair of two (02) MCC 480V CBs at Juaymah GP Tihama Power Generation Company Ltd. Tihama Power Generation Company Ltd. 2021 Completed 1. Perform complete visual inspection and cleaning for MCC panel and associated 480V circuit breakers. 2. Perform necessary repair and maintenance for the affected two (02) 480V circuit breakers and their connection to busbar. 3. Perform overall insulation test for breakers and their associated connection to busbar. 4. Perform contact resistance test for breakers to ensure their integrity. 5. Addition of busbar resleeving for all phases related to affected breakers. 6. Busbar tightness as per OEM torque level (70-100 NM mostly) related busbar legs connected to the two affected breakers. فتح الملف
69 INSTALLATION & REPLACEMENT OF MAJOR EQUIPMENTS AT 69kV AIR INSULATED BUS AT MERIDIEN SUBSTATION Abdullah Fouad Co. Abdullah Fouad Co. 2021 Completed - To dismantle existing material, packing, handover to the main contractor. - Visual inspection of received material, site testing, installations, functions check, electrical connections. - Fitting, fabrication, alignment, ensure proper operational checks. - Mark up drawing with final dimensions to be prepared on IFC drawing as hand sketching only. - General routine tests only applicable (contact resistance, insulation test MEGGER, local/Auto operational checks, interlock checks, functional checks). فتح الملف
70 Supply and installation of water ball valves Saudi Irrigation Organization Saudi Irrigation Organization 2021 Completed Supply and installation of water ball valves in eastern province. فتح الملف
71 Major PM of BOP transformer # 1 & 2 at Ghazlan PP , WO # 2202237418 KAFOU Technical Services KAFOU Technical Services 2021 Completed 1. Perform visual inspection of any oil leakage of the transformer and clean as necessary. 2. Clean transformer body and radiators using proper cleaning materials and equipment. Wash radiator Banks thoroughly to clean dirt/dust. Perform PM of fan motors and oil pumps, if applicable. 3. Test and calibrate temperature indicators, Buchholz relays, sudden pressure relays, pressure relief device etc and replace if defective. 4. Inspect Conservator level gauges for Main tank and OLTC. Inspect Main tank Conservator rubber bag condition for healthiness. Repair/replace rubber bag if required and Top up Conservator oil levels if required. 5. Inspect/test tap changer by manual and electrical operation. 6. Touch up painting as necessary 7. Provide all necessary test equipment and perform the following Test of the transformer: • Insulation resistance and PI of HV and LV winding • Resistance measurement of HV and LV winding • Turns ratio test at all tap positions. فتح الملف
72 Replacement of Faulty Transformer at SEC-Shedgum Power Plant KAFOU Technical Services KAFOU Technical Services 2021 Completed 1. Disconnection the faulty transformer and remove from the foundation by skidding lifting tools Unit 15 Step- Up TFMR, T605 at Shedgum P/P. 2. Faulty Transformer to be shifted to nearby area. 3. Disassembling of the new transformer, shift it to place of faulty transformer. (KTS will provide lifting equipment only). 4. Reassembling of the spare TFMR to replace T605 TFMR at Shedgum P/P. (KTS will provide lifting equipment only). 5. Evacuating and Oil Filling TFMR. 6. To perform XFMR oil filtration 7. To Perform One Time Standard DGA and Quality Lab Test. 8. Perform Electrical Test (Insulation Resistance, Winding PF, Bushing PF, TTR, Winding Resistance). 9. Perform functional checks for mechanical protection devices. 10. Connect HV, LV, to the system. 11. Trace, label & Connect the control and auxiliary cables. فتح الملف
73 Calibration of energy meters in SEC stations GCC lab Calibration Services Co GCC lab Calibration Services Co 2021 Completed Calibration of more than 250 energy meters in SEC stations in eartern brovance as per SEC standards. فتح الملف
74 Oil drainage, excavation, filling & filtering process for 125MVA shunt reactor ar RAQ substation. Cegelec Saudi Co. Cegelec Saudi Co. 2021 Completed Oil drainage, excavation, filling & filtering process for 125MVA shunt reactor ar RAQ substation. فتح الملف
75 Installation, testing and commisioing of DC motor at Meridian Substation in Khobar American Techno Controls Co. American Techno Controls Co. 2021 Completed Installation, testing and commisioing of DC motor in SF6 GCB mechanism at Meridian Substation in Khobar فتح الملف
76 MV cable termination for 2 MVA transformer @ Wisa area – National Water Company Civil Works Co. Civil Works Co. 2021 Completed MV cable termination and testing for 2 MVA transformer @ Wisa area – National Water Company فتح الملف
77 Modification and testing of LV generators Shelf Drilling Co. Shelf Drilling Co. 2021 Completed - Installation of space heaters for three generators at yard’s workshop - Testing of four generators - Testing of three DC motors فتح الملف
78 Testing and commissioning of LV panels at Jubail SWCC ALMASSA ALMASSA 2021 Completed Testing and commissioning of LV panels for three stations at Jubail SWCC فتح الملف
79 Repair oil leak at GSU transformer KAFOU KAFOU 2021 Completed Repair oil leak at GSUtransformer at GT # 14 from flexible joint between transformer & radiator. فتح الملف
80 Testing of Surge Arrestors at Jubail THABEER CONTRACTING EST THABEER CONTRACTING EST 2022 Completed Testing of Surge Arrestors at Jubail فتح الملف
81 Inspection & Testing of Circuit Breakers and Protection Relay of Electrical Switch Gear at Saudi Cement Sea Port SAUDI CEMENT SAUDI CEMENT 2022 Completed Inspection & Testing of Circuit Breakers and Protection Relay of Electrical Switch Gear at Saudi Cement Sea Port فتح الملف
82 Maintenance of Transformers SAUDI CEMENT SAUDI CEMENT 2022 Completed Maintenance of Transformers فتح الملف
83 Services for line # 6 RAW MILL elec. S/S Siemens MV Vacum CB & Protection Relays servicing & testing SAUDI CEMENT SAUDI CEMENT 2022 Completed Services for line # 6 RAW MILL elec. S/S Siemens MV Vacum CB & Protection Relays servicing & testing فتح الملف
84 JAL International Co. Ltd-DFRA Test of Transformer JAL International JAL International 2022 Completed JAL International Co. Ltd-DFRA Test of Transformer فتح الملف
85 Saudi Cement -REPLACEMENT OF CEMENT MILL 9&10 AND GYPSUM MV PANEL PROTECTION RELAYS SAUDI CEMENT SAUDI CEMENT 2022 Completed Saudi Cement -REPLACEMENT OF CEMENT MILL 9&10 AND GYPSUM MV PANEL PROTECTION RELAYS فتح الملف
86 ANNUAL CALIBRATION OF SIX (6) MV & LV KWH ENERGY METERS SAUDI CEMENT SAUDI CEMENT 2022 Completed ANNUAL CALIBRATION OF SIX (6) MV & LV KWH ENERGY METERS فتح الملف
87 Al-Fanar Construction -HUGRS - INVESTIGATION FOR HARADH - HUGRS LINE-2 TRIP Alfanar Construction Co. Alfanar Construction Co. 2022 Completed Al-Fanar Construction -HUGRS - INVESTIGATION FOR HARADH - HUGRS LINE-2 TRIP فتح الملف
88 العمارية بالرياض P3 لزوم محطة (VFD) توريد وتركيب جهاز مغير سرعة مضخة Saudi Irrigation Organization Saudi Irrigation Organization 2022 Completed العمارية بالرياض P3 لزوم محطة (VFD) توريد وتركيب جهاز مغير سرعة مضخة فتح الملف
89 (13.8KV/400V – 1MVA) أعمال الإصلاح المطلوبة في محطة قطاع رقم 5 على المحول Saudi Irrigation Organization Saudi Irrigation Organization 2022 Completed (13.8KV/400V – 1MVA) أعمال الإصلاح المطلوبة في محطة قطاع رقم 5 على المحول فتح الملف
90 Faras PP - MV Cable Termination from TM to mobile station KAFOU Technical Services KAFOU Technical Services 2022 Completed Faras PP - MV Cable Termination from TM to mobile station فتح الملف
91 SERVICES FOR LAYOUT OF 3-CORE 13.8KV POWER CABLE FROM S07 MAIN SUBSTATION TO CCBC S27A SUBSTATION SAUDI CEMENT SAUDI CEMENT 2022 Completed SERVICES FOR LAYOUT OF 3-CORE 13.8KV POWER CABLE FROM S07 MAIN SUBSTATION TO CCBC S27A SUBSTATION فتح الملف
92 Check & repair breaker # B316 , WO # 2202632612 / Emergency at Faras PP KAFOU Technical Services KAFOU Technical Services 2022 Completed Check & repair breaker # B316 , WO # 2202632612 / Emergency at Faras PP فتح الملف
93 Servicing unit no 15 GCB at Faras PP KAFOU Technical Services KAFOU Technical Services 2022 Completed Servicing unit no 15 GCB at Faras PP فتح الملف
94 Oil Filtration for 6 Transformers at AL JOUF PP JAL International JAL International 2022 Completed Oil Filtration for 6 Transformers at AL JOUF PP فتح الملف
95 Ghazlan PP - Inspection & Testing for Spare transformer (440/492.88 MVA) - Stage#2 KAFOU Technical Services KAFOU Technical Services 2022 Completed Ghazlan PP - Inspection & Testing for Spare transformer (440/492.88 MVA) - Stage#2 فتح الملف
96 STEP UP TRANSFORMER OIL LEAK ARRESTING & FILTRATION WORKS AT JUAIMA'H Tihama Power Generation Company Ltd. Tihama Power Generation Company Ltd. 2022 Completed STEP UP TRANSFORMER OIL LEAK ARRESTING & FILTRATION WORKS AT JUAIMA'H فتح الملف
97 THE SERVICING & TESTING OF 74 PROTECTION RELAYS SAUDI CEMENT SAUDI CEMENT 2022 Completed THE SERVICING & TESTING OF 74 PROTECTION RELAYS فتح الملف
98 Calibration of 32 Nos Energy Meters at SEC Al Jouf Power Plant. KAFOU Technical Services KAFOU Technical Services 2022 Completed Calibration of 32 Nos Energy Meters at SEC Al Jouf Power Plant. فتح الملف
99 Perform minor PM for eight (8) Nos Transformers at Faras Power Plant KAFOU Technical Services KAFOU Technical Services 2022 Completed Perform minor PM for eight (8) Nos Transformers at Faras Power Plant فتح الملف
100 Termination of MV cable ( 1X120mm2) JTC JTC 2022 Completed Termination of MV cable ( 1X120mm2) فتح الملف
101 Ghazlan PP - Inspection & Testing for Spare transformer (440/492.88 MVA) - Stage#1 KAFOU Technical Services KAFOU Technical Services 2022 Completed Ghazlan PP - Inspection & Testing for Spare transformer (440/492.88 MVA) - Stage#1 فتح الملف
102 Calibration of 30 NEXUS – 1250 Energy Meters at QCCPP 2022 KAFOU Technical Services KAFOU Technical Services 2022 Completed Calibration of 30 NEXUS – 1250 Energy Meters at QCCPP 2022 فتح الملف
103 Maintenance of Transformers at Al-Jouf Power Plant KAFOU Technical Services KAFOU Technical Services 2022 Completed Maintenance of Transformers at Al-Jouf Power Plant فتح الملف
104 Oil leak arresting works for 94 MVA, 70.7/13.8 kV Step Up Transformer at RTR (RFQ no. RTR4581) Tihama Power Generation Company Ltd. Tihama Power Generation Company Ltd. 2022 Completed Oil leak arresting works for 94 MVA, 70.7/13.8 kV Step Up Transformer at RTR (RFQ no. RTR4581) فتح الملف
105 Saudi Cement - Cement Ship Loader Diesel Engine SAUDI CEMENT SAUDI CEMENT 2022 Completed Saudi Cement - Cement Ship Loader Diesel Engine فتح الملف
106 فحص وتوريد وتركيب القاطع الكهربائي لزوم محطة الضخ الرئيسية بالرياض منفوحة Saudi Irrigation Organization Saudi Irrigation Organization 2022 Completed فحص وتوريد وتركيب القاطع الكهربائي لزوم محطة الضخ الرئيسية بالرياض منفوحة فتح الملف
107 "Installation, Testing & Commissioning and Oil filtration of six (06) transformers at Al-khobar SWCC station. 236 MVA , 230KV (two transformers) 186 MVA , 33 KV (two transformers) 50 MVA , 33 KV (two transformers)" El SEWEDY ELECTRIC Co. El SEWEDY ELECTRIC Co. 2022 Completed Off-loading, instalaltion of radiators, busingings, pipes, cable boxes, etc .. , and vacuming, oil filtration, testing. فتح الملف
108 Repair and filtration of START up xfmr oil leak repair @ JGP (PO # 22218) Tihama Power Generation Company Ltd. Tihama Power Generation Company Ltd. 2022 Completed 1-Isolate transformer and disconnect HV terminals. 2-Drain oil to appropriate level. 3-Isolate HV & LV connections. 4-Repair of oil leak by replacement of Gasket. 5-Toping up transformer’s oil level. (Using supplied oil of 5 drums only). 6-Oil filtration. 7-Perform BDV oil test. 8-Take oil samples for DGA test after oil filtration. 9- Submit technical report. 10- Replace the Buchholz relay if necessary. فتح الملف
109 Maintenance of one (01) 230/69 KV, 180 MVA Transformer at Khobar BSP (SEC Station) JAL International JAL International 2022 Completed Major ovehouling, repair oil leaks and filtration of one (01) 230/69 KV, 180 MVA Transformer at Khobar BSP (SEC Station) فتح الملف
110 Connection of TM unit in FARAS PP Saudi Electricity Company Saudi Electricity Company 2022 Completed Laydown 13.8KV cables and fiber optical cables to connect emegency TM unit to the switchgear. فتح الملف
111 ONLINE PD TESTING & HEALTHINESS EVALUATION OF LINE #7&8 SUBSTATIONS INCOMER POWER CABLES Saudi Cement Saudi Cement 2022 Completed ONLINE PD TESTING & HEALTHINESS EVALUATION OF LINE #7&8 SUBSTATIONS INCOMER POWER CABLES فتح الملف
112 SCC - SERVICING AND TESTING OF AUXILLARY TRANSFORMER LV BREAKER AND PROTECTION RELAY OF GT#6 AT POWER PLANT Saudi Cement Saudi Cement 2022 Completed SERVICING AND TESTING OF AUXILLARY TRANSFORMER LV BREAKER AND PROTECTION RELAY OF GT#6 AT POWER PLANT فتح الملف
113 SCC - replacement and service of 8 relays Saudi Cement Saudi Cement 2022 Completed Replacement and T & C 8 Siemens Relay for 13.8 SWG فتح الملف
114 SERVICES FOR INSTALLATION OF NEW CABLE TRAYS & LAYOUT/ TERMINATION OF SINGLE CORE 300KV (PRJ-23-012) SAUDI CEMENT SAUDI CEMENT 2023 In-Progress SERVICES FOR INSTALLATION OF NEW CABLE TRAYS & LAYOUT/ TERMINATION OF SINGLE CORE 300KV (PRJ-23-012) فتح الملف
115 Repair of Water Treatment Plant Transformer (AP7-1T1) SAUDI CEMENT SAUDI CEMENT 2023 Completed Repair of Water Treatment Plant Transformer (AP7-1T1) فتح الملف
116 Calibration of 23 Nos Energy Meters at SEC Qurayyah KAFOU Technical Services KAFOU Technical Services 2023 Completed I. SCOPE OF WORK 1. 1. Our scope of work is limited to provide one (1) qualified expert plus required tools & test equipment to perform calibration of energy meters in QCCPP. فتح الملف
117 Maintenance of Transformers at PP 12 Riyadh KAFOU Technical Services KAFOU Technical Services 2023 Completed I. SCOPE OF WORK 1. Visual inspection, marking leaking points. 2. Drain transformer oil, leak repair. 3. Gasket replacement for leaking points. 4. Replacement of oil gauge where ever required. 5. Vacuuming, oil filling, filtration. 6. Provide a mobile crane. 7. Supply Senior testing engineer, electrical transformer specialist, OLTC specialist. 8. Supply of oil filtration plant, vacuum machine, and oil tankers. 9. Replace any defective mechanical protection device. 10. Take an oil sample for oil quality and DGA after the filtration is finished. 11. Electrical testing and mechanical checks are as follows: • Winding resistance measurement. • short circuit Impedance measurement. • Turns Ration Test. • Capacitance and tan delta for winding and HV bushing. • Excitation current. • HV winding dynamic resistance. • Insulation resistance. • Oil Temperature Indicator-calibration & testing. • Winding Temperature Indicator calibration & testing. • Transformer CT testing. • BDV, Buchholz relay, OMG, WTI and OTI. 12. OLTC maintenance and testing: for all transformers. • Static resistance measurement. • Motor current measurement. • Greasing of mechanical and electrical parts. • Dissolved gas analysis (DGA). • OLTC motor drive insulation resistance measurements and check mechanical bearings. فتح الملف
118 SUPPLY & INSTALLATION OF NEUTRAL BUSHING AT ZONE 5 IN SAUDI IRRIGATION FACILITY Saudi Irrigation Organization Saudi Irrigation Organization 2023 Completed SUPPLY & INSTALLATION OF NEUTRAL BUSHING AT ZONE 5 IN SAUDI IRRIGATION FACILITY فتح الملف
119 SUPPLY & INSTALLATION OF PHASE # A BUSHING AT ZONE 5 IN SAUDI IRRIGATION FACILITY Saudi Irrigation Organization Saudi Irrigation Organization 2023 Completed SUPPLY & INSTALLATION OF PHASE # A BUSHING AT ZONE 5 IN SAUDI IRRIGATION FACILITY فتح الملف
120 SERVICES FOR ANNUAL CALIBRATION OF MV & LV KWH ENERGY METERS AT POWER PLANT (PR#17470) SAUDI CEMENT SAUDI CEMENT 2023 Completed SERVICES FOR ANNUAL CALIBRATION OF MV & LV KWH ENERGY METERS AT POWER PLANT (PR#17470) فتح الملف
121 MINOR PREVENTIVE MAINTENANCE OF 04EA. TRANSFORMERS FOR BFT#1 & 2 AND BOP#1 & 2 AT FARAS POWER PLANT KAFOU Technical Services KAFOU Technical Services 2023 Completed MINOR PREVENTIVE MAINTENANCE OF 04EA. TRANSFORMERS FOR BFT#1 & 2 AND BOP#1 & 2 AT FARAS POWER PLANT فتح الملف
122 JGP-GT3 UAT Transformer OLTC chamber flange oil leak urgent temporary rectification Tihama Power Generation Company Ltd. Tihama Power Generation Company Ltd. 2023 Completed JGP-GT3 UAT Transformer OLTC chamber flange oil leak urgent temporary rectification فتح الملف
123 Auxiliary transformers (17 nos.) Oil Leak at PP12 Power Plant KAFOU Technical Services KAFOU Technical Services 2023 Completed Auxiliary transformers (17 nos.) Oil Leak at PP12 Power Plant فتح الملف
124 Study, review, and implementation of relay settings (MV and LV system) for the faculty of pharmacy project, Hail University. AL Fahd Company AL Fahd Company 2023 Completed Study, review, and implementation of relay settings (MV and LV system) for the faculty of pharmacy project, Hail University. فتح الملف
125 Troubleshooting & Electrical Tests of T603 at Shedgum PP KAFOU Technical Services KAFOU Technical Services 2023 Completed Troubleshooting & Electrical Tests of T603 at Shedgum PP فتح الملف
126 SUPPLY PANEL,TPN DISTRIBUTION BOARD,6-WAYS, 250A, 400VAC, 60HZ, INCOMER:250A TP SAUDI CEMENT SAUDI CEMENT 2023 Completed SUPPLY PANEL,TPN DISTRIBUTION BOARD,6-WAYS, 250A, 400VAC, 60HZ, INCOMER:250A TP فتح الملف
127 SERVICES FOR INSTALLATION OF NEW CABLE TRAYS & LAYOUT/ TERMINATION OF SINGLE CORE 300KV (PRJ-23-011) SAUDI CEMENT SAUDI CEMENT 2023 Completed SERVICES FOR INSTALLATION OF NEW CABLE TRAYS & LAYOUT/ TERMINATION OF SINGLE CORE 300KV (PRJ-23-011) فتح الملف
128 SERVICES FOR INSTALLATION OF NEW CABLE TRAYS & LAYOUT/ TERMINATION OF SINGLE CORE 300KV SAUDI CEMENT SAUDI CEMENT 2023 Completed SERVICES FOR INSTALLATION OF NEW CABLE TRAYS & LAYOUT/ TERMINATION OF SINGLE CORE 300KV فتح الملف
129 ANNUAL OIL ANALYSIS FOR THE TRANSFORMER SAUDI CEMENT SAUDI CEMENT 2023 Completed ANNUAL OIL ANALYSIS FOR THE TRANSFORMER فتح الملف
130 Corrective maintenance and OLTC maintenance for no of three transformers (380KV,100MVA) at PP12 Durma Riyadh KAFOU Technical Services KAFOU Technical Services 2023 Completed Corrective maintenance and OLTC maintenance for no of three transformers (380KV,100MVA) at PP12 Durma Riyadh فتح الملف
131 SUPPLY PANEL,TPN DISTRIBUTION BOARD, 6WAYS, 250A, 400VAC, 60HZ, INCOMER:250A TP SAUDI CEMENT SAUDI CEMENT 2023 Completed SUPPLY PANEL,TPN DISTRIBUTION BOARD, 6WAYS, 250A, 400VAC, 60HZ, INCOMER:250A TP فتح الملف
132 Installation, testing & Commissioning of 2Ea. LV MCC with cable laying & connections at Qassim PP KAFOU Technical Services KAFOU Technical Services 2023 Completed 1. Dismantling of Old MCC # 106 & 107. 2. Installation, Testing & Commissioning of New MCC (106 & 107) 3. Cable Laying and Termination (3.5C x 300sqmm), 2 Runs X 200 Meters, Termination 3 Core X 4 Ends. 4. Installation of Cable Tray- 400 x 100 x 1.5mm x 25 Meters (Height: 4Meters) 5. Laying of 4" PVC Pipe X 400 Meters for Underground cable. 6. Testing & Commissioning of 106 MCC with 1 Incoming Feeder + 6 Outgoing Feeder. 7. Testing & Commissioning of 107 MCC with 1 Incoming Feeder + 10 Outgoing Feeder. فتح الملف
133 Troubleshooting & Electrical Tests of T603 at Shedgum PP KAFOU Technical Services KAFOU Technical Services 2023 Completed Troubleshooting & Electrical Tests of T603 at Shedgum PP فتح الملف
134 Faras PP ACM work on 4ea. Transformers (BFT & BOP# 1 & 2). KAFOU Technical Services KAFOU Technical Services 2023 Completed Perform the corrective maintenance as above mentioned SOW for Tr BOP- 1: 1- Rectifying Oil leak from Buchholz relay flange. 2- Oil drain and gasket replacement required. 3- Tan-δ test. Perform the corrective maintenance as above mentioned SOW for Tr BOP- 2: 1- Rectifying Oil leak from Buchholz relay flange. 2- Rectifying Oil leak from the LV bushing and a Minor leak from the HV bushing. 3- Oil drain and gasket replacement required. 4- Rectifying N CT cracked in LV compartment & CT testing. Perform the corrective maintenance as above mentioned SOW for Tr BFT-1: 1- Rectifying Oil leak from Buchholz relay flange. 2- Rectifying Oil leak from the LV bushing and a Minor leak from the HV bushing. 3- Oil drain and gasket replacement required. 4- Tan-δ test. Perform the corrective maintenance as above mentioned SOW for Tr BFT-2: 1- Rectifying Oil leak from Buchholz relay flange. 2- Rectifying Oil leak from the LV bushing and a Minor leak from the HV bushing. 3- Oil drain and gasket replacement required. 4- Tan-δ test. فتح الملف
135 Testing & Commissioning for MLT-6,7,8,9 and SD-6,7,8 for ATCO-ARAR Project-LV penels ATCO ATCO 2023 Completed Testing & Commissioning for MLT-6,7,8,9 and SD-6,7,8 for ATCO-ARAR Project-LV penels فتح الملف
136 SERVICES FOR THE SUPPLY OF MATERIALS, INSTALLATION AT SITE & COMMISSIONING FOR THE MV PANELS PROTECTION RELAYS FOR LINE #6 SAUDI CEMENT SAUDI CEMENT 2023 Completed SERVICES FOR THE SUPPLY OF MATERIALS, INSTALLATION AT SITE & COMMISSIONING FOR THE MV PANELS PROTECTION RELAYS FOR LINE #6 فتح الملف
137 Overhaul and repair ARAMCO Transformers-3Nos in GCC Lab GCC ELECTRICAL TESTING LABORATORY GCC ELECTRICAL TESTING LABORATORY 2023 Completed Overhaul and repair ARAMCO Transformers-3Nos in GCC Lab فتح الملف
138 EXIT-10 AL HAMRA DEVELOPMENT PROJECT, RIYADH AL FUTTAIM ENGINEERING & TECHNOLOGIES AL FUTTAIM ENGINEERING & TECHNOLOGIES 2023 In-progress EXIT-10 AL HAMRA DEVELOPMENT PROJECT, RIYADH فتح الملف
139 Repairing & Testing of GT-6 Generator Breaker Switchgear Panel (K-12). SAUDI CEMENT SAUDI CEMENT 2023 Completed Repairing & Testing of GT-6 Generator Breaker Switchgear Panel (K-12). فتح الملف
140 SERVICING OF 110VDC BATTERY CHARGER FOR LINE #6 RAW MILLS, KILN COOLER, CEMENT MILLS #9 &10, AND GYPSUM AREAS. SAUDI CEMENT SAUDI CEMENT 2023 SERVICING OF 110VDC BATTERY CHARGER FOR LINE #6 RAW MILLS, KILN COOLER, CEMENT MILLS #9 &10, AND GYPSUM AREAS. فتح الملف
141 T.M Unit Cable Termination & Jointing at Faras PP KAFOU Technical Services KAFOU Technical Services 2023 Completed T.M Unit Cable Termination & Jointing at Faras PP فتح الملف
142 SHED PP - INVESTIGATION FOR Unit 13 CB TRIP. KAFOU Technical Services KAFOU Technical Services 2023 Completed SHED PP - INVESTIGATION FOR Unit 13 CB TRIP. فتح الملف
143 SEC-Jazan Power Plant- (13.8KV BSDG SWGR) Installation, Testing & Commissioning KAFOU Technical Services KAFOU Technical Services 2023 Completed SEC-Jazan Power Plant- (13.8KV BSDG SWGR) Installation, Testing & Commissioning فتح الملف
144 Installing works & extra T&C works for Al Hassa housing SS 115/13.8KV Almashariq Trading and Contracting Company Almashariq Trading and Contracting Company 2023 In-Progress 1- Installation of: 1.1 Installation of 3 -13.8kV Capacitor Bank with related series reactor, capacitor, CT, VT & Surge Arrestors. 1.2 Installation of Battery system. 1.3 Installation of Communication panels at Comm. Room. 1.4 Installation of SUB-DCDB panel. 1.5 Installation of Outdoor Lighting Panels and indoor lighting system (Remaining panels) 1.6 Installation Lightening protection system and all grounding installations rather than ground mesh. 1.7 "Installation & Connection of ground mesh as per approved drawing." 1.8 "Installation SAS Disc & related HID. 1.9 "Install and Erection of protection Panels Related Alhassa Housing CKT1 &CKT2 With AMI Panel” (Remote End SS) 1.10 "Installation of Communication panels at Comm. Room" 1.11 Installation for Telephone system panels. 2- MV Cable Laying and pulling: 2.1 "Power Transformer :6R-1C*630SQ.MM,15kV, CU/XLPE CABLE/PHASE (TYP" 2.2 "Aux. Transformer:1R*3C*300SQ.MM XLPE.CU CONDUCTOR 15KV CABLES" 2.3 "Capacitor’s Bank: 1R*1C*630 SQ.MM 15KV CU/XLPE CABLES/PHASE" 3- MV Power Cable Termination. 4- Laying and Puling LV Control Cable 5- LV Control Cable Termination: 6- Oil Circulation / Filtration for 3 Power Transformer 132/13.8 KV 80 MVR فتح الملف
145 Preventive maintenance and testing of 14 GCBs in PP12 KAFOU Technical Services KAFOU Technical Services 2023 Completed Preventive maintenance and testing of 14 GCBs in PP12 فتح الملف
146 THE ASSESSMENT & TESTING OF PLANTWIDE LINE #7&8 LOW VOLTAGE CAPACITOR BANKS & CONTROLS SAUDI CEMENT SAUDI CEMENT 2023 Completed THE ASSESSMENT & TESTING OF PLANTWIDE LINE #7&8 LOW VOLTAGE CAPACITOR BANKS & CONTROLS فتح الملف
147 SERVICES FOR 13.8KV/ 400V 60HZ POWER SUPPLY ARRANGEMENT FOR HOFUF KHD & GUEST HOUSING SAUDI CEMENT SAUDI CEMENT 2023 Completed SERVICES FOR 13.8KV/ 400V 60HZ POWER SUPPLY ARRANGEMENT FOR HOFUF KHD & GUEST HOUSING فتح الملف
148 Urgent Repairing & Testing of GT-6 Generator Breaker Switchgear Panel (K-12). SAUDI CEMENT SAUDI CEMENT 2023 Completed Urgent Repairing & Testing of GT-6 Generator Breaker Switchgear Panel (K-12). فتح الملف
149 SERVICING OF 110VDC BATTERY CHARGER FOR LINE #6 RAW MILLS, KILN COOLER, CEMENT MILLS #9 &10, AND GYPSUM AREAS. SAUDI CEMENT SAUDI CEMENT 2023 Completed SERVICING OF 110VDC BATTERY CHARGER FOR LINE #6 RAW MILLS, KILN COOLER, CEMENT MILLS #9 &10, AND GYPSUM AREAS. فتح الملف
150 Jeddah Warehouse – survey, site visit and Transformer’s oil sampling. NRTC NRTC 2023 Completed Jeddah Warehouse – survey, site visit and Transformer’s oil sampling. فتح الملف
151 SERVICES FOR SUPPLY, INSTALLATION AND COMMISSIONING OF BUS COUPLER SWITCH FOR THE T2 PACKING PLANT LOW VOLTAGE SECONDRY LINE (PR# 27078) SAUDI CEMENT SAUDI CEMENT 2023 In-Progress SERVICES FOR SUPPLY, INSTALLATION AND COMMISSIONING OF BUS COUPLER SWITCH FOR THE T2 PACKING PLANT LOW VOLTAGE SECONDRY LINE (PR# 27078) فتح الملف
152 Upgradation and replacement of defective protection relay SAUDI CEMENT SAUDI CEMENT 2023 In-Progress Upgradation and replacement of defective protection relay فتح الملف
153 Riyadh PP12 GT&ST-GSUTs (470MVA&454MVA) HV Cable Box - Oil drain and filtration work KAFOU Technical Services KAFOU Technical Services 2023 Completed Riyadh PP12 GT&ST-GSUTs (470MVA&454MVA) HV Cable Box - Oil drain and filtration work فتح الملف
تحميل...